In building construction, setting out refers to the process of transferring the dimensions and layout from the construction drawings to the actual building site. This crucial step ensures that the construction work is executed accurately and according to the design plans. Setting out is essential for establishing the correct positions of foundations, walls, columns, and other building elements. Several methods are used for setting out in building construction, and each method is chosen based on the site's characteristics, project complexity, and available equipment.

=======================================

Everything you need for professional plan management,

CONSTRUCTION PLAN & DOCUMENT MANAGEMENT

Get FREE Offer.

========================================

 

Here are some common methods of setting out:

Offset Method:
The offset method involves establishing a baseline or reference line from which all other dimensions are measured. The baseline is typically a straight line that runs parallel to a prominent feature on the site or a permanent benchmark. Measurements are then taken perpendicular to this baseline to set out the positions of walls, columns, and other structural elements.

Three-Dimensional Coordinate Method
The three-dimensional coordinate method uses x, y, and z coordinates to precisely locate points on the site. It requires the use of advanced surveying equipment such as total stations and GPS (Global Positioning System) to establish the exact positions of building elements in three-dimensional space. This method is particularly useful for complex projects with irregular shapes and elevated structures.

 Right Angle Method:
The right-angle method is based on the principles of right-angled triangles. Surveyors use a theodolite or a total station to set out a baseline and then create perpendicular lines at specific points to form right angles. This method is commonly used for establishing the positions of walls, corners, and foundations.

Diagonal Method:
The diagonal method is employed when precise right angles cannot be established due to site constraints or irregular shapes. It involves setting out diagonal lines from specific points to determine the positions of building elements. This method is especially useful for irregularly shaped plots and structures.

 Triangulation Method:
The triangulation method uses the principle of trigonometry to establish the positions of points. Surveyors measure the angles and distances between known reference points and use trigonometric calculations to determine the positions of other points. Triangulation is often used in large construction sites or when accurate measurements need to be taken over significant distances.

Profile Board Method:
The profile board method is commonly used in road construction and involves setting up profile boards along the alignment of the road. The boards represent the desired road levels and gradients. Surveyors then use a level and staff to transfer these levels onto the actual ground, guiding the construction of the road to the specified design.

 Grid System Method:
The grid system method divides the construction site into a grid pattern with regularly spaced reference points. Surveyors use this grid to establish the positions of building elements, making it easier to ensure accuracy and uniformity in the construction process.

Taping Method:
The taping method is a simple and cost-effective way of setting out small-scale projects. It involves using a measuring tape to establish distances and angles between points. While not as precise as advanced surveying methods, taping can be sufficient for basic construction projects.

Conclusion:
Setting out is a critical phase in building construction that ensures the accurate execution of design plans on the construction site. The method chosen for setting out depends on the complexity of the project, the site characteristics, available equipment, and the required level of precision. By employing the appropriate setting out method, construction professionals can maintain accuracy, reduce errors, and achieve successful project outcomes.

 

==========================================================